top of page

Car Park and Walkway Lighting Phase 1

Writer's picture: GMI ElectricalGMI Electrical


GMI Electrical has recently completed phase 1 of a car park and walkway lighting replacement at a comprehensive school in Cardiff with energy efficient LED lighting. The main goal for this replacement is for the staff and students to safely enter and exit the premises with adequate lighting levels, but another great benefit is its low energy consumption and 50,000 hour average operating time.


All the lighting is controlled by a time-switch and photocell, the reason for using two methods is to ensure the lighting is never on when its day time, then the timer will switch the lighting off at a set time each night, out of the schools operating hours to eliminate light pollution for the neighbouring houses and also reduce energy consumption.



15 views0 comments

Comments


EICR Landlord test testing and inspection led lighting fuse board consumer unit pat maintenance electrician electrical contractor health and safety compliance co alarm smoke detector heat detector preventive maintenance new sockets rewire 

CALL US

01443 526016

EMAIL US

info@gmielectrical.co.uk

  • Facebook

FOLLOW US

© 2024 GMI Electrical Ltd - All Rights Reserved - View our Privacy Policy

bottom of page